Now you are ready
to install your regulation cups. Arrange them on the sub base. Next mark
the place where the cup will be permanently placed. This can be done by
applying pressure to each cup and rotating it. This will cause a small
indentation in the sub base that will be used as a marker or reference
point.
Using a small hand
shovel dig a hole that is at least 2 inch larger around than the cup
itself.
Because your cups
are 6 inches tall you need to make your hole 6 inches in depth. The cups
once placed in the holes should be one quarter inch above the top of the
sub base material. Don’t worry if you go deeper because you can always
back fill the hole with the loose dirt. Add fast drying concrete mix
powder around the entire outside perimeter.
Use the handle of
your hand shovel to pack down the mix. Leave 1 inch of the cup exposed.
Add water to the concrete mix until it is saturated.
Next add sub base
around the exposed perimeter of the cup. Compact the sub base around each
cup by running the compactor directly over the cup. This will
automatically level and make the cup flush with the top of the sub base.
Do each hole in the same manor. |