Distribute the sub
base material evenly. Working with a yard rake, spread out the sub base
material so that it is consistently flat. Use a shovel to move the large
amounts of sub base material and the flat side of a rack to smooth out any
rough areas of the sub base. Drainage will be off the top of the green and
not through the green. Drainage through the green would eventually
deteriorate the packed sub base. There must be a slight slope to the sub
base for proper water drainage. A good rule of thumb is 1 inch drop every
ten to twelve feet the length of the green. |