Installation Process - Step 11
   
    
   
 
 
   
   
   













View the Video of Step 11

Nail down the black seaming strips on the sub base where the seam will come together. Make sure there is on equal amount of black strip on each side of the seam.

Spread the adhesive over the entire surface of the black strip. Make sure the thickness of the adhesive is no more than 1/8 inch. Allow 20 to 25 minutes for the adhesive to set up and get sticky before seaming.

Lay each piece of the putting green turf over at the seam.

<<<Previous Step                                                             Next Step>>>
 

Home        About Us       Hours & Location